Tutorial · sheets

Sixty views, sixty sheets,
one click.

New Sheet → pick title block → drag the view on → nudge it → type the number → rename. Sixty times. Here is how to do it once.

Views on the left become numbered sheets on the right in one action: each view placed on its own sheet with the chosen title block and a sequential number. VIEWS · picked in Hub ☑ L01 - Floor Plan ☑ L02 - Floor Plan ☑ L03 - Floor Plan ☑ L01 - RCP ☑ L02 - RCP … 55 more selected Create sheets from views A1 titleblock · A-101 → A-160 SHEETS · 60 created, numbered A-101A-102A-103A-104 Also: renumber and rename sheets, align viewports, delete empty sheets, add a revision to all of them.

The built-in way

Revit has no “sheets from views” command. The closest is duplicating a sheet and swapping the viewport, which still means placing and numbering each one. Sheet lists via Dynamo are possible (Sheet.ByNameNumberTitleBlockAndView) if someone keeps the graph alive.

With Parapet Hub

Pick the views - plans, RCPs, sections, elevations, any mix - from the Views category or a search like “L0”.
Create sheets from views. Choose the title block type, a number prefix (A-) and start (101), and whether the sheet name copies the view name.
Run. Sixty sheets, each view placed and centred in its title block, numbered A-101…A-160. One transaction; Ctrl+Z removes them all.
Keep the set tidy with Renumber sheets, Rename sheets, Align viewports, Delete empty sheets and Add / remove revision on sheets.

Views & sheets actions in Hub

ActionWhat it does
Create sheets from viewsOne sheet per view, placed, numbered, named
Renumber / rename sheetsPrefix, start, step; find & replace in names
Align viewportsSame position on every sheet in the pick
Duplicate viewsWith / without detailing, as dependent
Apply / remove view template · scale · detail level · disciplineBulk view settings
Delete unplaced views · delete empty sheetsHousekeeping before issue
Add / remove revision on sheetsIssue a revision to the whole set

FAQ

Can I choose a different title block per view type?

Run the action once per group - pick the plans, run with A1; pick the details, run with A3. Each run is its own undo.

Does it respect existing sheet numbers?

Yes - the sequence skips numbers already in use, and the result line lists any it skipped.

Try Parapet Hub free for 30 days

$19/month or $149/year after the trial. No card to start.

Download Parapet All 108 actions

Keep reading

Related guides, tutorials and comparisons.

All guides →